ADU (accessory dwelling unit)
A secondary dwelling on a residential lot — backyard cottage, guest house, or a delivered unit like a folding-box home. Many jurisdictions have streamlined ADU approval paths that small factory-built units can fit.
AHJ (authority having jurisdiction)
The local body — usually the building department — with legal power to review plans, issue permits, and inspect. The AHJ’s interpretation controls, even where manufacturer documents exist.
Anchorage
The components and connections that resist uplift, sliding, and overturning. “Rated anchorage” means the parts have been designed and tested for specific load values — the crux of the permanent-foundation definition.
Auger anchor (ground anchor)
A steel shaft with a helix plate screwed into the soil; the standard manufactured-home wind anchor. Excluded, by itself, from the PFGMH’s permanent-anchorage definition.
Base flood elevation (BFE)
The elevation of the 1%-annual-chance flood on the local flood map. In flood hazard areas, the home’s lowest floor must sit at or above it.
Bearing capacity
How much load the soil can safely support, in pounds per square foot (psf). Drives footing and pad sizing; 1,500 psf is the regulatory default when the soil type is unknown.
Chassis
The permanent steel frame a manufactured home is built on and transported with. It stays with the home for life — one of the defining features of the HUD-code product.
Chattel loan
Personal-property financing, like a vehicle loan — the default for manufactured homes not affixed to owned land. Typically higher rates and shorter terms than a mortgage.
CMU (concrete masonry unit)
The hollow-core concrete block used for piers and walls; nominal 8×8×16 inches. Stacking rules for pier height are set by 24 CFR 3285.303.
Crawl space
The enclosed, non-habitable space under a home on a perimeter-wall foundation, typically 18 inches to 3 feet of clearance, with ventilation and a ground vapor barrier.
Data plate
The paper label inside a manufactured home listing its design wind zone, roof load zone, and thermal zone. Found in a utility closet, near the electrical panel, or in a bedroom closet.
Exposure category (B/C/D)
An ASCE 7 classification of the site’s wind surroundings: B sheltered suburban, C open terrain, D flat water-adjacent. The same structure carries different wind loads in different exposures.
FHA / VA / USDA
The federal loan programs whose rules make foundation certification a routine requirement for manufactured homes. FHA’s permanent-foundation standard is the PFGMH.
Finished floor elevation (FFE)
The target height of the completed floor relative to grade. Drives drainage, flood compliance, utility stub heights, and stairs — lock it early.
Footing
The element that transmits loads to the soil: a pad under a pier or a continuous strip under a wall. Reinforced concrete, below frost depth, for permanent-foundation purposes.
Frost depth (frost line)
How deep the ground freezes locally — from zero in the South to 100+ inches in the far North. Footings bear below it to avoid heave; the AHJ sets the number.
FPSF (frost-protected shallow foundation)
A design using perimeter insulation instead of deep footings to prevent frost heave, per SEI/ASCE 32. An accepted alternative in many jurisdictions.
Geotechnical report
A soils investigation establishing bearing capacity, soil type, and groundwater conditions. Often required by the AHJ; always decisive when it exists.
Grade beam
A reinforced concrete beam at or near grade providing continuous support lines, often bearing on improved soil or deeper elements.
HUD code
The federal Manufactured Home Construction and Safety Standards, 24 CFR Part 3280. Preempts local building codes for the home itself; effective June 15, 1976.
HUD label
The red metal certification label on the exterior of each transportable section of a manufactured home. Its presence is the fastest classification test there is.
ICC-ES / ESR
ICC Evaluation Service and its Evaluation Service Reports, which confirm a product meets code requirements — e.g., ESR-4725 for Boxabl’s structural insulated panels. An ESR certifies the product, not your site or permit.
Longitudinal ties
Straps, struts, or bracing resisting forces parallel to the chassis I-beams. The most commonly missing anchoring component and a leading cause of failed foundation reviews.
Marriage line
The junction where sections of a multi-section home join. Requires its own piers or supports — and for dual-module folding units, unified bearing behavior.
Manufactured home
A dwelling built on a permanent chassis to the HUD code (post-1976), transportable in one or more sections. Distinct from modular (state/local code) and mobile (pre-1976) homes.
Modular home
A factory-built home constructed to the same state/local codes as site-built housing, set on a conventional foundation, and treated as real property from the start.
Park model RV
A recreational vehicle built to ANSI A119.5, capped at 400 square feet, titled as an RV — which is what usually keeps it outside mortgage financing regardless of its foundation.
PE (Professional Engineer) / seal
A licensed engineer legally responsible for a design or certification; the seal (wet or digital) is the formal act of taking that responsibility. Many AHJs and all major loan programs rely on it.
Permanent foundation
Under the FHA/PFGMH definition: durable materials, site-built, rated anchorage, reinforced concrete footings below frost depth, and a continuous perimeter enclosure. Screw-in anchors alone don’t qualify.
PFGMH
HUD’s Permanent Foundations Guide for Manufactured Housing (HUD-4930.3G, 1996) — the standard for permanent-foundation compliance in FHA/VA/USDA lending on HUD-code homes.
Pier
The support element between footing and home: stacked CMU, steel jack stands, treated wood, or listed manufactured piers. Height rules come from 24 CFR 3285.303.
SDC (seismic design category)
An A–F classification assigned to a site from location, soils, and risk category — never an inherent property of a building product.
SIP (structural insulated panel)
A factory-laminated sandwich panel — facings bonded to a foam core — carrying structure and insulation in one element. The Boxabl panel pairs steel and MgO facings over an EPS core.
Skirting
Non-structural weather enclosure between the home and grade. Not a perimeter enclosure wall, and not a substitute for one in permanent-foundation reviews.
Stabilizer plate
A metal plate at a ground anchor’s head that bites the soil and keeps the anchor from rotating under load.
Stem wall
A short perimeter concrete or masonry wall rising from a footing, creating a crawl space and elevation control between ground and structure.
Tie-down / strap
The steel band connecting chassis (diagonal) or sidewall (vertical) to ground anchors. Vertical sidewall straps are required in Wind Zones II and III.
Title elimination / affixture
The state legal process that retires a manufactured home’s vehicle-style title and merges the home into the land’s deed — the paperwork half of becoming real property.
Vapor barrier
Polyethylene sheeting (6-mil minimum under homes; also under slabs) blocking ground moisture. Required in enclosed under-floor spaces except in arid regions.
Wind zone
HUD’s three-zone map setting anchorage requirements: Zone I interior, Zones II and III coastal/hurricane-prone. A home may not be sited in a higher zone than its data plate shows.